
Down to the studs
New plumbing rough-in for a shower and double vanity.

Primary and guest bathroom remodels with walk-in showers, tile, vanities, and fixtures, waterproofed the way it should be.
Our restoration side has torn out a lot of failed showers. Missing pans, bad membranes, and unsealed penetrations cause most of the water damage we see. Every shower we build gets a proper waterproofing system before the tile goes on.

Sloped pans and continuous membranes under every tiled shower.
We plan around your routine: vanity height, niches, and storage.
Old tile and fixtures removed with dust protection for the rest of the house.
Tile layout, grout lines, and trim checked before final walkthrough.
The same five-step process on every job, so you always know what's next and who's responsible.

We talk through goals, budget range, and timing, then walk the site.

A written, line-item scope so you know what's included and what isn't.

City permits, selections, and a schedule that sequences every trade.

Daily site management, photo updates, and inspections passed the first time.

Punch list, final clean, and a closeout walkthrough before we call it done.
See finished Coyote Construction Group projects in our project gallery

New plumbing rough-in for a shower and double vanity.

Large-format porcelain set level and flat.

Subway tile shower with a floating vanity.
Free consultations for custom homes, additions, remodels, roofing, commercial work, and insurance reconstruction. We review every request and call you back to talk through scope, budget, and timing.
Call or text to schedule a free consultation. We'll walk the site, talk through scope and budget, and give you a clear written next step.